top of page
Search

Powerkure System @ Plastiglas

Juan Carlos Plaul

This project started in 2013 when Plastiglas El Salvador ordered a small system for testing purpose

iAfter installing the Power saving system, one master device and some satellites directly connected to several Huskys, Plastiglas realized we helped saving on energy and maintenance costs.


Satisfaction

We are fully satisfied with the Powerkure system we installed and thats why amplified the system to cover almost all machines including not only Huskys but the compressor and blowing machines.

 
 
 

تعليقات


© 2019 by O P T I M I S E N S E   L L C . Proudly created by Juan & Salva Plaul

  • 390x
  • 390
  • b-facebook
bottom of page